Laserfiche WebLink
<br />....L.......... a~ WA'1~R <br />sss 2629 Redwing Rd. Suit, Fort Collins, Colorado 80526 <br />(303)226-3535 <br />~ WASTE fax (303) 226-6475 <br />& LAND <br />INC <br />January 7, 1994 <br />Battle Mountain Resources,lnc. <br />P.O. Bax 310 <br />San Luis, Colorado 8 1 1 5 2-031 0 <br />Attention: Alana L. Scott, Environmental Engineer <br />Subject: San Luis, Third-Party Technical Oversight <br />Dear Alana, <br />WWL N390 <br />Attached is WWL's invoice for work conducted on the San Luis project from December 1 <br />through 31, 1993. This is the second invoice to Battle Mountain Resources, Inc. (BMRI) <br />under the October 15 Agreement for Third Party Oversight and Review conducl~ed under the <br />direction of the Division of Minerals and Geology (DMG). <br />This invoice totals 57,655.89 and consists of work conducted under Task<c 2 and 3 of <br />Exhibit A of the October 15 Agreement. All of the Exhibit A tasks are listed below and are <br />referred by task number in the tables that follow. <br />Task Description <br />1 Familiarization with Approved Plan <br />2 Field Construction Oversight <br />3 Oversight of Field Testing Program <br />4 Review of Related Technical Submittals <br />5 Review of Final Construction Certifications <br />6 Participation in Meetings <br />The professional time and expenses outlined in this invoice have been separated by task. <br />Discussion of work progress and anticipated expenditures have also been separated by task, <br />as stipulated in Articles 3.2 and 3.3 of the October 15 Agreement. These items are outlined <br />below. <br />Consulting Engineers and Scientists <br />