Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenr of Natural Resources <br />1717 Sherman fr., Room 21 S <br />Denver, CU 90iu.7 <br />phone: llU31 B6b.7567 <br />iA%: (lOI183Z~tl106 <br />;.;Z9 ~ .~ <br />+.;•,1- <br />(.? , <br />i \•\ •ra7 <br />`. a ,' puY pOmer <br />C6F1` ~ Gor.mor <br />MlclW I !.loop <br />OIrIYm Dlrtcsa <br />February 19, 1993 <br />Me. Kathleen Welt <br />Mountain Coal Company <br />West Elk Mine <br />F.O. Box 591 <br />8omsraet, Co e143a <br />gE: sotiee of violation C-sa-006; West Lik Mine; File <br />HO. C-80-007 <br />Dear Me. Welt; <br />Enolosad is Notice of Violation (NOV) C-93-006, issued to Mountain <br />Coal Company for failure to submit a 6ubsidence Monitoring Report <br />on a semi-annual basis as required by page 2.05-147 of MCCrs permit <br />axd section 2.05.6(6)(c)(i)(E) of .the Regulations o! the Colorndo <br />Mined Land Reclamation Soard for Coal Mining. <br />The Division is issuing the violation based on the fact that a <br />semi-annual report was not received from MCC during the period from <br />October 1990 until a report was received January 19, 1993. The <br />submittal o! these semi-annual reports is considered to be very <br />important, beoauee future mining advancements ors conditioxed upon <br />the results of this survey monitoring program. since MCC is <br />planning to propose, in the Hoar suture, a mine plan which mines <br />beneath potentially critical renewable resource lands, it is <br />imperative that a demonstration can be made to show that impacts <br />can be controlled through a subsidence control plan. The Division, <br />must therefore, have the opportunity to review the subsidence <br />reports on a periodic basis. <br />The NOV form lists throe steps that must be aacompliehed ox or <br />before llpril 19, 1993, in order to successfully abate the <br />violation. The lollawinq will provide further detail in what must <br />be included in each of txe abatement steps. <br />STEP 1: The record is unclear as to when the Subsidence <br />Monitoring Reports are due. It appears that most of the <br />surveys are completed in June and October; therefore, the <br />Division proposes that the semi-annual reports Ce submitted by <br />July 37 and November 30 of each year. In order to fulfill <br />this abatement step, MCC must agree with the dates set forth <br />by the Division or propose.altsrnative dates to ba accepted by <br />the Division. <br />