My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14025
DRMS
>
Back File Migration
>
Revision
>
REV14025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:12 AM
Creation date
11/21/2007 10:47:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
1/15/1986
From
SNOWMASS COAL CO
To
MLR
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~~~~V~® <br />JAN iS }986 <br />"~;,,~.D LAND RECLAMATi4N <br />!";i9. 920t. 0} ~otpr~i PPSrEirr;r+a, <br />SNOWMASS COAL COMPANY <br />Mine Ollrce~ P.O. Box 980 <br />Carbontlale. Coloratlo 81623 <br />1303) 963-3440 <br />January 14, 1986 <br />~II II~II~!I~II~~ II~ <br />Ms. Candace Thompson <br />Hydrologist <br />Mined Land Reclamation <br />1313 Sherman Street, Room 423 <br />Denver, CO 80203 <br />Dear Ms. Thompson: <br />Pursuant to Section 2.08.4 of the Mined Land Reclamation Division's Rules and <br />Regulations for Coal Mining, Snowmass Coal Company hereby requests a technical <br />revision to Permit C-025-81. The purpose of this technical revision is to <br />allow Snowmass Coal Company the right to reduce the surface and groundwater <br />monitoring requirements approved in the aforementioned Permit. <br />Background <br />Snowmass Coal has been completely idle since July, 1984. Snowmass has continued <br />to perform all water monitoring requirements since that time. All data has <br />indicated that the North Thompson Creek Mines have not impacted the local hydrol- <br />ogy (see annual hydrology reports). Since it now appears that the North Thompson <br />Creek Mines are going to remain in a temporary cessation mode for an extended <br />period of time, Snowmass feels that a detailed water sampling program is no longer <br />warranted. <br />Request <br />Table I shows the existing proposed sampling requirements for surface and ground- <br />water monitoring stations at the mine and loadout sites. The following discussion <br />is an explanation of each proposed sampling requirement. <br />Loadout Wells No. 1, 2, 3, and Upstream and Downstream Roaring Fork River: <br />_ ;; Snowmass proposes to cease all field and laboratory monitoring <br />sj requirements at the unit train loadout facility. Five years <br />of sampling have shown that the loadout has had no impact on <br />the local surface or groundwater. <br />Holes 1, 3, and 4: <br />Snowmass proposes to cease all field and laboratory monitoring <br />of these wells. All data has shown that the mines have not <br />
The URL can be used to link to this page
Your browser does not support the video tag.