Laserfiche WebLink
<br />iii iiiiiiiiiiiii iii <br />STATE OF COLORAUU <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3567 <br />FAX: 13031 832-8106 <br />April 18, 1994 <br />Mr. Allen S. Weaver <br />Energy Fuels Mining Company <br />P.O. Box 449 <br />Florence, CO 81226 <br />Re: Adequacy Review, Technical Revision TR-14 <br />Energy Fuels Mining Company <br />The Raton Creek Mine, Permit Ne. C-82-055 <br />Dear Mr. Weaver: <br />r~ <br />B <br />DEPARTMEM" O~ <br />NATURAL <br />RESOURCE' <br />Roy Romer <br />Governor <br />Ken Salazar <br />&ecmrvc Director <br />Michael 8. long <br />Division Director <br />The Division has conducted its preliminary adequacy review of TR-14. Please provide your <br />responses to the following items by April 29, 1994. For the ease of replacement into the <br />current Raton Creek application, responses should be formatted as permit application <br />replacement pages where appropriate. <br />The proposed decision date for TR-14 is currently scheduled for May 6, 1994. Should an <br />extension of this decision date be necessary for the purposes of providing the requested <br />responses, please contact us. <br />1. Rule 2.04.3(4): The post mining land use proposed in the current permit is Rangeland. <br />Please provide a description of current land uses, and land use classifications, under local <br />law, if any, of the permit area and adjacent areas. <br />2. Rule 2.04.9(1)(el: Please provide a discussion of the present productivity of soils in <br />undisturbed areas in the vicinity of the mine site. Please compare this productivity to that <br />of the soils to be used for reclamation of the disturbed areas at the mine site, addressing in <br />particular the productivity of the areas that will receive only 4.5 inches of topsoil. <br />3. Rule 2.04.9(3): Should the responses to Item 2 of this letter demonstrate that the 4.5- <br />inch topsoil replacement depth be insufficient to achieve vegetation sufficient to support a <br />rangeland use, please discuss how much additional topsoil will be needed, and whether <br />any overburden materials will be selected as topsoil substitutes or supplements. If over- <br />burden materials will be used, please provide results of any analyses, trials, and tests <br />described in Rule 4.06.2. <br />4. Rule 2.05.3(3): Pages 348 through 356d of the permit application provide a narrative of <br />the mine facilities. Please provide an updated narrative, describing those facilities that <br />have been removed and those facilities previously approved to be removed that are now <br />