My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21888
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:48 PM
Creation date
11/21/2007 10:03:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
9/18/1980
Doc Name
STATUS OF NOVS 80-4 80-5 81-21 80-27 & 80-28 OF THE TRINIDAD BASIN MINE 79-53
From
MINERAL RESOURCES AND ENGINEERING INC
To
MLRD
Violation No.
CV1981021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~-- III IIIIIIIIIIIIIIII <br />999 <br />MINERAL <br />RESOURCES <br />AND ENGINEERING, INC. <br />September 18, 1980 <br />Ms Carol Pahlke <br />Mined Land Reclamation Division <br />423 Centennial. Ruil.ding <br />1313 Sherman Street <br />Denver, CO 80208 <br />RE: Status of NOV's 80-9, 80-5, 81-21, 80-27, & 80-28 of the <br />Trinidad Basin _^.ine. Your file #79-53 <br />Dear Carol: <br />As you know, the above referenced NOV's required specific action <br />on the part of TBM to abate the violation in the required tiem period. <br />I am pleased to inform you that all the violations have been abated <br />as of this date, either thru on the ground measures or incorporating <br />these areas into a new mining and reclamation sequence. The violations <br />are as follows: <br />Violation 80-4a: The mine plan has been revised in relation to this <br />violation. In the August 29th submittal, this area was referred to <br />as overburden stockpile #9 and the final status of this area generated <br />score concern on your part. TBM has revised its mining and reclamation <br />plan for this area to satisfy your concerns. The approximately 15,000 <br />yards of material contained in this area will be used in the construction <br />of the haul road leading into the mining area. Specifically the <br />material will be used in the area of sediment pond 22-P10, if all the <br />excess material is not used in this construction area, it will be <br />stockpiled for final deposition in cut 11. However, before the over- <br />burden material is removed the area wi].1 be stripped of the topsoil <br />that had been reapplied. This topsoil will be tec~orarily stockpiled <br />in topsoil stockpile #1. After the excess overburden is removed the <br />topsoil will Le reapplied and the area reclaimed per the approved plan. <br />This work will be completed by C~tober 10, 1980. <br />Violation 80-46: This violation will be abated once approval for <br />mining to the west is approved by your office. Once the mining begins in <br />this area this will be the first pit to be back filled and reclaimed <br />as per the reclamation schedule. Our discussions have indicated that <br />it is not logical to fill this pit at this time if mining is to proceed <br />P. O. Box 758, Golden, Colorado 80401 Telephone (303) 278-8665 <br />
The URL can be used to link to this page
Your browser does not support the video tag.