My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21023
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:18 PM
Creation date
11/21/2007 9:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Enforcement
Doc Date
12/30/1993
Doc Name
NOV C-93-153 NOV C-93-154 NOV C-93-155 NOV C-93-156 NOV C-93-157
From
DMG
To
WESTERN FUELS-UTAH
Violation No.
CV1993155
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III IIIIIIIIIIIIIIII <br />" ~ STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1717 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: 0031 866-3567 <br />FAX: (7071 832.8106 <br />December 30, 1993 <br />Mr. Nurari 8hrestha <br />Western Fuela-Otah <br />405 IIrban Street <br />Suite 305 <br />Lakexood, CO 80228 <br />RE: NOV C-93-153 <br />NOV C-93-154 <br />NOV C-93-155 <br />NOV C-93-156 <br />NOV C-93-157 <br />Dear Mr. Shrestha: <br />of Oro <br />ti~~ <br />Me <br />tB T6 <br />Roy Romer <br />Governor <br />Michael B. long <br />Divivon Dvector <br />The Division has received your responses (dated December 27, 1993) <br />to the NOV's referenced above and has the following comments: <br />NOV C-93-153: The referenced certifications were received by FAX, <br />but the original mailed copy with Mr. Weigand's PE certification <br />stamp has not yet been received. <br />NOV C-93-154: The response to this NOV was satisfactory. <br />Termination of the NOV may be completed following an inspection of <br />the area of concern. <br />NOV C-93-155: As mentioned in your letter, WFU has begun to <br />address the permitting of small area exemptions and alternate <br />sediment control measures. However, the lack of these permit <br />designs has now been identified in a notice of violation. <br />Consequently, WFU needs to address this matter within the abatement <br />time frames included in NOV C-93-155. The abatement deadline for <br />NOV C-93-155 is March 15, 1994, which is 90 days after the date of <br />issue of the NOV. Therefore, completion of the SAE demonstrations <br />as a part of the permit renewal process in July is not acceptable. <br />The Division will be happy to meet with WFU to discuss abatement of <br />this NOV, if requested. <br />NOV C-93-156: The Division approves the extension of the submittal <br />of the compaction testing schedule to January 18, 1994. Note, <br />however, that the modification notice for this NOV, which was <br />
The URL can be used to link to this page
Your browser does not support the video tag.