Laserfiche WebLink
:~ <br /> <br /> <br />written on December 21, 1993, includes additional abatement <br />measures as outlined below: <br />1) Submit, by January 15, 1994, a plan to conduct penetration <br />tests on the refuse piles in order to verify compaction. <br />The submittal of this plan may also be extended'to <br />January 18, 1994; <br />2) Implement the penetration testing plan by March 15, 1994. <br />NOV C-93-157: There appears to be some confusion on the part of <br />WFU as to what is required by this NOV. Certification of <br />the impoundments involves either a certified statement to <br />the effect that the impoundments were constructed in <br />accordance with the design specifications, or, if the <br />construction differs significantly from the design, a <br />certified "as-built° drawing showing the actual <br />construction of the impoundment. The maps submitted and <br />referenced by WFU do not satisfy either of these <br />alternatives. Please refer to Rules 4.05.9(2), <br />4.25.6(10), 4.05.9(10) and 4.05.9(13). <br />If you have any questions regarding the comments in this letter, <br />please call me at (303) 866-3567 X353. <br />Sincerely, <br />Barbara L. Pavlik <br />Environmental Protection Specialist <br />m:\coal\blp\c81018.nov <br />