My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03823
DRMS
>
Back File Migration
>
Revision
>
REV03823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:46 AM
Creation date
11/21/2007 9:12:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Revision
Doc Date
5/18/1988
Doc Name
PR-1 BOURG MINE WALDEN COAL CO C-81-021
From
MLRD
To
WALDEN COAL CO
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_, <br />~~ <br />~ iii iuiiiiiiiiu i <br />STATF, OF COLORADO <br />Roy Romer, Governor <br />ra <br />,~ c2 <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION ~f' <br />FRED R. BANTA, Direetor 'f ~; <br />Mdy 18, 1988 <br />Ms. Kay James <br />Vice-President <br />Flatiron Companies <br />Walden Coal Company <br />P.O. Box 229 <br />Boulder, CO 80306 <br />Re: PR-1, Bourg Mine, Walden Coal Company, C-81-021 <br />Dear Ms. James: <br />I had understood from our previous meetings, and our discussion on the phone <br />on May 18, 1988 that Flatiron would submit the parameters and assumptions for <br />the distrubed (mulched soil) case which would be used in SEDIMOT (watershed <br />input parameters and sediment basin input parameters per the SEDIMOT Design <br />Manual), as well as responses to our questions of February 24, 1988. The <br />intent of acquiring approval on these parameters would preclude the necessity <br />of performing multiple computer runs. Please include your proposed inputs in <br />the submittal. <br />The following comments are responses to your adequacy letter. Please clarify <br />the responses to MLRD questions 2, 3, 4, 5, 9, 11, 12 and 13. l have <br />requested commitments for the submittal of as-built designs within 30 days of <br />construction as well as a commitment for the submittal of monitoring datz. <br />These commitments will ensure that actual construction reinforces the design <br />and that re-mulching and seeding can be performed in a timely manner, if <br />necessary. <br />MLRD <br />Adequacy MRA <br />Letter Response Comment/Question <br />1 The submitted map is an adequate response to our <br />request. <br />2 1 The sampling locations map should have a name and <br />number. <br />° There are 15 sites shown on the map for which data <br />is not given--Site Nos. 14, 17, 22, 23, 24, 26, 27, <br />28, 29, 35, 36, 65 66, 67 and 68. <br />° Site No. 21 is not identified on the map. <br />° Please discuss the condition of the adjacent <br />("undisturbed") land per the second paragraph of <br />page 2 of MLRD's 2/24/88 letter. <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 7e1. (303) 666-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.