My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03730
DRMS
>
Back File Migration
>
Revision
>
REV03730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:39 AM
Creation date
11/21/2007 9:11:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
10/2/1997
Doc Name
APPLICATION FORM FOR A REVISION TO A COAL MINING AND RECLAMATION PERMIT
Type & Sequence
TR31
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
------ <br />'~$ CO SORA~eD~IVIS,ION OF er~CvolLoradoL8o2o3~. (D3oG EOL III IIIIII~IIIIIIIII <br />~a~s <br />~~.~FI~. ~~= <br />APPLICATION FORM FOR A REVISION DCT 0 2 1997 <br />TO A COAL MINING AND RECLAMATION PERMIT <br />iiviSlU^ w ~+~~uciaia a bd010ny <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.041731, <br />technical revisions, as defined in Rule 1.0411361, and permit revisions, as defined in Rule 1.041901. All <br />revisions are to address the requirements of Rule 2.08.4. Three 131 copies of the revision, including maps, <br />must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be <br />printed in the lower right corner of each revision page. A cover letter to the revision should explain the nature <br />of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list (except OSM) at the same time the application is submitted to the Division, and proof of distribution must <br />be submitted to the Division along with the application. Copies of revision pages modified during the review <br />process must be distributed in the same manner, along with proof of distribution. Proof of distribution must <br />be submitted prior to implementation of the revision. <br />Permit No.: C - 81 - 022 Date: ~_ / JjL / ~L <br />Permittee: OXBOW CARBON 8 MINERALS, INC. <br />Street: 3737 HIGHWAY 133 <br />P.O. BOX 535 <br />City: SOMERSET <br />State: ~_ Zip Code: 81434 - <br />Brief Description of Revision: LONGWALL MINING SUBSIDENCE EVALUATION <br />Public Notice Attached: Yes X No <br />Bond Increase: Yes No X <br />Proposed Change in: <br />(Required for PRs and TRsI <br />Federal X Non-Federal Mine <br />Disturbed Area (+/-) 0 . 0 Acres <br />Permit Area (+/-) 0 0 Acres <br />State Land 1+/-) Acres <br />Affected Area 1+/-1 Acres <br />Federal Land 1+/-) _ _ 0 0 Acres <br />Private Land (+/-) 0 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.