My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03638
DRMS
>
Back File Migration
>
Revision
>
REV03638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:32 AM
Creation date
11/21/2007 9:10:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986124
IBM Index Class Name
Revision
Doc Date
12/21/1994
Doc Name
SUCCESSION OF OPERATORS AND FINANCIAL WARRANTY CECIL II GRAVEL PIT PN M-86-124
From
DMG
To
POPEJOY CONSTRUCTION CO INC
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />I J 13 Sherman Si., Room 215 <br />Denver, ColoraAo 8020} <br />Phone. 130 31 866-3567 <br />FA% 11071 ft32 8106 <br />December 21, 1994 <br />Mr. Eric K. Schwein <br />Popejoy Construction Co., Inc. <br />P.O. Box 385 <br />Ulysses, KS 67880 <br /> <br />III fll~Ol~flI~~~BQ DID ~ OF COLORADO <br />~'~ <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />Eaeeulive Director <br />Michael8 Long <br />Division Director <br />RE: Succession of Operators and Ftinancial Wamutty, Cecil II Gravel Pit, <br />Ntile No. M-86-12~t <br />Dear Mr. Schwein: <br />On December 14, 1994 the Division conducted an inspection of the Cecil II Gravel Pit. A copy of <br />this inspection report has been sent to you under separate cover. <br />The financial warranty has been calculated. Our estimate was based on the following data: <br />- Regrading to establish the required 8H-IV slopes <br />15,310 BCY at $0.212/LCY = $3,647.40 <br />- Seed and fertilize the regraded slopes to ensure <br />wntrol of erosion - $600.00/acre x 3.2 acres = $1,920.00 <br />- Mob/Demob - 4 hours at $150.00/hour = $600.00 <br />Subtotal $6,167.40 <br />Mined Land Reclamation Fund, Overhead, and Indirect Costs 21.6 percent 1 332.10 <br />Total $7499.50 <br />(Round off to $7,500.00) <br />Upon receipt of an acceptable $7,500.00 financial warranty and the completion of the enclosed <br />performance warranty, the Division will approve your Transfer of Permit and Succession of Operators <br />Application. <br />If you have any questions please feel free to contact me. <br />Sincerely, <br />~lgg R. u/ fe " 1 <br />Environmental Protection Specialist <br />Enclosures <br />cc: Cazl Mount, DMG M:~ussVmm~SdrvT+v.6r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.