Laserfiche WebLink
Colorado Division of Mi revels end Geolog~ <br />F ESTIMATING FORM - BULLD02ER NORK <br />Task k: 1 Prep. by: GRS Task File Name: M124-1 <br />Date:^- 72/79/94 Permit #:M-86-124 pine: Cecil Ii --- -- <br />Permit Action: 5. 0. Reclamation cost est. ~ ^y <br />Task Descri ptian: Grade to 8H-1Y slopes <br />HOURLY EQUI POTENT COST <br />Basic Machine: LaI D8N <br />Blade Type: Universal <br />Attachment fit: RODS Lab <br />Attachment S2: N/A <br />Horsepower: 285 <br />Shift Basis: 1/day <br />Coat Breakdown: <br />------------ Utilization X (code DSO) <br />Ownership Lost/hr = 3:40.42 N/A <br />Operetirp d overhaul cost/hr- dozer = 540.63 100 <br /> -ripper = 50.00 N/A <br />Operator cost/hr = 521.58 N/A <br />Total egpt. unit cost/hr = 5102.63 Total fleet cost/hr: 5102.63 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />loose <br />Volume: 15,310.0 BCY Factor: 1.124 Volume: 17,202.2 LCY <br />Souree of Quart ity take-off: Exhibit E <br />Source of est. swell factor: Program <br />HOURLY PRWUCT ION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 100 ft. ----^------------- -------- <br />-------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.00 (Cat tbl) <br />dozer production: 964 LCY/hr Dozing method..... 1.00 (gen.) <br />--------- Visibility........ 1.00 (avg.) <br />Materiel tarsi steney: Job efficiency.... 0.83 (ish/day) <br />Consolidated stockpile Transmission type. 1.00 ( PS ) <br />----^-------------------- --------- Grade edj ustment.. 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude adj. .... 1.00 (Cat tbl) <br />--------- Material weight... 0.81 (Cat tbl) <br />Avg. site altitude: 4330 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 2850.00 lb/LLT Net Job Correction :~ 0.50 <br />Met. Desc r.: ____--__ _ --_ __---___ <br />Send - Dmrp Adjusted Unit Prod.: 484.01 LCY/hr <br /> Adjus ted Fleet Production: 484.01 LCY/hr <br />JOB COST --- -------- <br />Fleet size 1 Dozen(s) Total Job Time: 35.54 Hours <br />Unit Cost 50.212 /LCY Total Job Cost: 53,647.40 <br />