My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03269
DRMS
>
Back File Migration
>
Revision
>
REV03269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:04 AM
Creation date
11/21/2007 9:07:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/9/2000
Doc Name
MEMO TR37 NMD POWER BOREHOLE FOIDEL CREEK MINE C-82-056
From
DMG
To
JANET BINNS
Type & Sequence
TR37
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman BI., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAK: (303) 832-8106 <br />Interoffice Memo <br />To: Janet Binns ~/~ /~/~~~~~ <br />From: Kent Gorham ~ / <br />Date: 06/09/00 <br />Re: TR-37, NMD Power Borehole, Foidel Creek Mine, #C-82-056 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />HINING•SAFETY <br />Bil I Owens <br />Governor <br />Greg E Watcher <br />Eeeculive Director <br />Michael B Lnng <br />Division Director <br />I have completed my adequacy review of the materials received by the Division <br />on May 18, 2000 submitted by Twentymile Coal Company for technical revision <br />#37 (TR-37) for the Foidel Creek Mine. <br />The operator states in the cover letter submitted that "As we discussed, the <br />exhibits submitted under permit revision number 5 for this facility, i.e. cultural <br />resources, road design and sediment control can be removed from the permit <br />revisions number 5 materials and inserted into this technical revision <br />application." These materials were not in the file folder I received for review. <br />However, I did find some materials in the PR-05 file folder in your office that I <br />believe to be the majority of what the operator is referring to. The operator <br />should submit these pages with the proper date and revision number before <br />approval. All things considered, my issues are as follows: <br />1. Text page 2.05-65.2 states the culvert at the entrance to the pad is to <br />route drainage under the road and around the pad. Page DP-1 of the SEDCAD <br />materials states the runoff to the culvert consists primarily of light-use road <br />runoff. This information is contradictory and should be corrected as necessary <br />to be consistent. <br />2. The Figure 1 that is referenced in the SEDCAD text consists of regional <br />geologic structural information rather than NMD Power borehole information. <br />The operator should submit three copies of Figure 1. <br />3. The topsoil amount stated on page 2.05-65.2 for the pad itself seems to <br />include the road based on the bond calculations. <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.