Laserfiche WebLink
4. The revised page information lists pages 2.05-62.2 and 2.05-62.3. Is <br />this a typo that should be 2.05-65.2 and 2.05-65.3? <br />5. As a comment, it is important that the operator use gravel as stated in <br />the plan to reduce the amount of sediment leaving the site. This is part of the <br />sediment control plan and the function of the site as an SAE. This gravel cover <br />should be maintained for the duration of the facility. <br />This concludes my review. If you have questions, please let me know. <br />CC: Dan Hernandez <br />• Page 2 <br />