Laserfiche WebLink
• iii iiiiiiiiiiiiiii • <br />Ready Mix Concrete • Sand & Gravel • Crushing & Construction <br />June 21, 1993 <br />Mr. Bill York-Feirn <br />Department of Natural Resources <br />*Sined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Bill: <br />,R~C~~IV~~ , <br />JUN 2 3 19g~ <br />Diwsior, a ;w~ua~t,~. <br />t'~'~~iG.aY <br />In following up on our telephone conversation regarding the Meeker <br />Sand & Gravel, Meeker Pit, liM-76-038 Bond, we would like to express <br />some of the following areas of concern: <br />1) One the Demolition sheet, the concrete quantities <br />were misfigured. <br />The 22500 df should be out as that figure is <br />15'x30'x50' which is the inside dimensions of <br />our shop. <br />The 1960 cf, 198 cf, and 196 cf couldn't be accounted <br />for as they were incorrect as the batch plant doesn't <br />have concrete walls, it is 2x4 framed. <br />The amounts that should be keot are: <br />495 cf - shop floor <br />320 cf - shop footing <br />198 cf - batch plant floor <br />1,013 27 = 37.50 cy <br />2) On the Estimating form - Means Cost Data Sheet <br />The shop floor does not contain rebar. <br />The batch plant floor does not contain rebar. <br />P. O. Box 1550 • Meeker, CO 81641 (303) 878-3671 <br />