Laserfiche WebLink
HOM~, 'AKE • <br />C~ <br />ROY R. CELLAN <br />CORPORATE MANAGER <br />RECLAMATION <br />December 14, 1999 <br />III IIIIIIIIIIIII III ~ <br />ENVIRONMENTAL, HEALTH. SAFETY <br />AND GOVERNMENT AFFAIRS <br />f, <br />pis ~. ~~®~Y <br />h ~~~c1.. .~S <br />State of Colorado <br />Division of Minerals and Geology <br />Durango Field Office <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />Attn: Mr. Steve S. Shuey, Reclamation Specialist <br />RE: Bulldog Mine Reclamation Project <br />November, 1999 Monthly Monitoring Report <br />Dear Mr. Shuey: <br />r, <br />ReceTv~ <br />DES 21 19gg <br />Dry~~ ~ nM9o"F e~ ~/~ <br />Pursuant to the Technical Revisions to the Reclamation Permit for the Bulldog <br />Reclamation Project, this is the twenty-fourth monthly report pertaining to 1) <br />installation and operation of an infiltration trench to accommodate seepage from the <br />9360 adit, and 2) closing the valve at the 9360 adit plug. The Division of Minerals <br />and Geology {DMG), in a letter dated March 8, 1999, issued a conditional approval <br />for Homestake Mining Company (HMC) to close the valve at the 9360 adit plug. <br />Subsequent to DMG's approval, HMC closed the valve to the adit plug on April 1, <br />1999. Since closure of the adit plug valve, no flow was directed into the infiltration <br />trench. Monitoring of the hydraulic conditions behind the adit plug indicated that as <br />of August 25, 1999, conditions had stabilized (ie pressure measurements stabilized). <br />As a result, DMG approved initiation of the planned tracer test (Ref: Letter from <br />WMCI to Mr. Steve Shuey, dated August 27, 1999). The tracer test subsequently <br />began on September 9, 1999. With the initiation of the tracer test, HMC is committed <br />to the monitoring summarized in Table 1 in accordance with the approved Technical <br />Revisions. <br />The revised monitoring program was initiated in September 1999. A summary of the <br />monthly monitoring data is presented in Table 2. Based on the required visual <br />inspection around the adit plug, the plug is impounding water behind it with no signs <br />of seepage and/or development of seeps around the portal area. No flow was <br />observed in DT-1 during the monthly sampling activities. Minimal flow was observed <br />in DT-2 and samples taken as shown in Table 2. Completed analyses of the <br />charcoal and water samples taken during this period as part of tFie tracer test indicate <br />that no fluorescein dye was detected in any of the samples (see attached Ozark <br />Underground Lab analytical results). <br />HOMESTAKE MINING COMPANY <br />P.O ROX 98 • GRANTS, NM B]02P0011 <br />