Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />August 7, 2002 <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Mrs. Jamie W. Gaboriau Governor <br />Aggregate Industries - WCR, Inc. r' Greg E. Walther <br />3605 S. Teller St. Fxec°tlve Director <br />Lakewo CO 80235 Ronald w. Canany <br />Acting Division Director <br />/ / ~ <br />Re: Cooley Gravel Company, Dahlia North Resources Pit, M-1994-093, Permit Issuance -Construction <br />Material Operation <br />Dear Mrs. Gaboriau: <br />On December 17, 1996 the Division of Minerals and Geology found Cooley Gravel Company to have satisfied the <br />applicable requirements of C.R.S. 34-32.5-101 et seg. for obtaining a mining and reclamation permit. Therefore, <br />a permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for our <br />files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of the <br />permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />pemlit. They have been incorporated imo the permit by reference. We presume that you have a wpy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the pemut. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modi&cation to the pemlit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, December 17th, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $688.00. Please consult the Ad, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />S' <br />i~ti~ <br />RONALD W. CATTANYC~t <br />Division Director <br />RWC/ESC/bdc <br />Enclosure <br />