Laserfiche WebLink
i, <br />OFFICE OF THE STATE ENGINEER <br />Division of Wa[er Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (3031 866-3581 <br />FAX (303) 866-3589 <br />www.watecsta[e.w.us <br />From: <br />Doc. Name:...S L~ <br />Doc. Date (if no date stamp): __ <br />June 17,2004 <br />Mr. Richard T. Raines <br />Applegate Group, Inc. <br />1499 W. 120"' Avenue, Suite 200 <br />Denver, CO 80234-2728 <br />Re: Substitute Water Supply Plan, North Taft Hill Expansion Site (DMG #M-01-051) <br />Sections 33, TBN, R69W, 6th P.M. <br />Water Division 1, Water District 3, Lorimer County <br />Dear Mr. Raines: <br />pF' p0~ <br />He <br />~. <br />~O~ <br />x/8]6 « <br />~o <br />~~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />This letter is in response to your application for a substitute water supply plan for the North <br />Taft Hill Expansion Site. The required fee of $1,343 forthe substitute water supply plan has been <br />submitted. <br />This plan describes the proposed water uses for the period of June 2004 through January <br />31, 2005 for this new mining operation. Mining will occur in a 13-acre cell. The site will be <br />continuously dewatered therefore the proposed plan anticipates the net depletions associated with <br />the groundwater exposed in the dewatering trenches (0.4 acres) and a sediment pond (0.1 acres). <br />Because this is a new mining operation, no groundwaterwas exposed within the permit boundary <br />prior to January 1,1981. After the nine months the lake will be allowed to fill, as the mining operation <br />will begin at the nearby Overland Pond site. Although a substitute water supply plan for the Overland <br />Ponds site was approved through October 31, 2004, no mining operation began at this site and is <br />not expected to begin until February 2005. <br />You have provided a monthly breakdown of the depletions for the nine months of operation, <br />made up of 0.97 acre-feet of evaporative loss for up to a maximum of 0.5 acres of exposed <br />groundwater in the dewatering trenches and a sediment pond. Material mined at the North Taft Hill <br />Expansion Site (previously proposed to be mined at the Overland Ponds site) will be processed at <br />the adjacent Home Office Pit (M-77-439). Depletions associated with mining of up to 500,000 tons of <br />aggregate per year (14.7 acre-feet) and 2 acre-feet per year of water used for dust control will be <br />replaced underthe Home Office Pit Substitute Water Supply Plan. The substitute water supply plan <br />for the Home Office site is currently valid through October 31, 2004. No phreatophyte credit has <br />been applied to this plan. <br />The proposed source of replacement for this pit is net accretion credits at the river that occur <br />due to the dewatering operation. Based on the information provided the dewatering rate was <br />assumed to be 1,200 gallons per minute. The timing of the lagged depletions from the dewatering <br />operations was determined through a stream depletion model for the North Taft Hill site. The model <br />accounts for the accretions and depletions when the site is being dewatered and the lagged <br />depletions after the dewatering stops in February 2005. <br />