Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />E~~.4 <br />S Coal Company <br />Mr. Wallace Erickson <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Company <br />July 17, 1995 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Mr. Erickson: <br />Enclosed are copies of the second quarter stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The 'as-built' certifications will be submitted as <br />soon as possible once they are finished. <br />Any necessary maintenance work on all the stockponds will be <br />commencing shortly. Conditions for the third quarter inspections <br />should hopefully reflect that this work has been completed. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />