My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60721
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:31 PM
Creation date
11/20/2007 6:49:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980135
IBM Index Class Name
Permit File
Doc Date
7/31/1980
Doc Name
HEADLEY FARM PITS FN 80-135
To
GALEN HEADLEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />July 31, 1980 <br />hx. Galen Headley <br />i .0. IiOX 9A <br />i;rush, Colorado 90723 <br />1'.r: Headley Farm ^its - Our File No. AO-I35 <br />near 1'Ir. Headley: <br />In order to consider this application adequate for the August <br />27-7_&, 1980, meeting of the Mined Lard A.PClamation_ Soarc~, wP <br />will reed t1-~e folloo,inc items ac'dressed in retail: <br />A. 5xhibit D - mining Plan <br />1. To what depth will eravel be mined in each pit? <br />nota many feet of Qravel will he left over tre <br />Pierre Sl:ale? <br />2. :Iota marv inches of topsoil tai 11 be removed and <br />stockpiled at each pit? Cive the location of each <br />topsoil stockpile and the ~pnror_ir:±ate amount of <br />cubic •tards stored in each. <br />3. tiow many cubic yards of overburden twill be used in <br />the reclaration and where will the stockr.iles be <br />located? A1,so, please descriL•e how many inches of <br />overburden will be stripped at each site. <br />L. i;xliibit E - Feclamation Flan <br />1. Slopes of the nit must also be topsoiled and see3ed. <br />7.. Hots muct: additi.ona]. "topsoil" material will be <br />available from the applicants reservoirs? <br />3. The ulti~rate vonci shown in Fit *:o. [, on the <br />reclamation map ahocxld be created in such a way as <br />to minimize the straight shorelines. <br />4. Flease state in inches and cubic yards, how much <br />topsoil and overburden will .be replaced on the <br />disturbed areas. <br />5. Critical area plantings suct+ as reclaimed gravel <br />operations should be uulcY:ed after seeding at the <br />rate of 1~ to 2 tons per acre mechanically crimped <br />intc the soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.