Laserfiche WebLink
Galen Headley -2- July 31, 1980 <br />6. After reolacin?; the topsoil, a soil analysis must <br />be done to determine what, if anv, fertiliser <br />needs to be added. <br />C. Exhibit F - Water Resources <br />1. This section. is currently beirr. reviewed by the <br />P.iviaion of Water Resources. A cony of their <br />review will be sent as soon as it is made available. <br />D. Exhibit J - Vegetation <br />1. 4?e su~~est the followinv seed mix be used for <br />reseeding areas which will not be farmed: <br />Sideoats drama - 2.5 pounds PLS/A <br />Little bluester.~ - 2. pounds PLS/A <br />Thiclcspike wheatgrass3. pounds PLS/A <br />Flue drama - .5 Hounds PLS/A <br />Yellow sweet clover .5 pounds PLS/A <br />E. r,xhibit L - Reclamation Costs <br />1. Since reclamation ori11 he ar. onroin.^ activity, it <br />is suPgested that the applicant detert~ine the <br />maximum disturbance for each nit in T"ajer, Lioderate <br />and Minor categories. See Rule 2.12 (4) d. This <br />will deterr.:ine the maximum asourt of disturbance <br />to he allowed at-anv one time during the course of <br />mining oneratiors for purroses of bonding. <br />Feclamation costs will be figured as follows: <br />Renlacemert of topsoil and overburden - 1.50/cu. yd. <br />Soil preparation <br />Fertilizer <br />Seed~nr <br />Mulch <br />- $ ti0/acre <br />- $ . 60/oeur.3 <br />- y 15/round <br />- $22n/acre <br />Please respond to the above as sour. as possible. If there <br />are anv gvestiens, please feel free to contact me. <br />Sincerely, <br />,Tames B. McArdle <br />k..ecla_matior. Specialist <br />J:3'': mab <br />