Laserfiche WebLink
<br />• <br />EXHIBIT D - Reclamation Plan <br />Page 5 <br />III IIIIIIIIIIIII III <br />sss <br />1. Description - of how will handle overburder. Original stripping to <br />be stockpiled and as pit progresses the remaining overburden <br />will be used to backfill completed pit area. <br />2. Thickness of top soil to be replaced: <br />All available topsoil will be utilized, striving for thickness as <br />recommend in the Soil Conservation field report. <br />3. Describe gradient of reclaimed slope. <br />3:1 <br />4. Describe seeding operation The seeding fertilizer and mulching <br />will be done in accordance with the recommendations of the soil <br />conservation report. Seedbed will be disced. <br />5. Describe grass, forb, shrub and tree specie: <br />Please see Soil Conservation Report attached. <br />6. Describe the application method of seeding <br />Please see Soil Conservation Report attached. <br />7. Describe the mulch: <br />Please see Soil Conservation Report attached. <br />8. Describe any road, streams & ponds that will remain: <br />None <br />9. Describe how any left over rock etc. will be handled. <br />N/A <br />