Laserfiche WebLink
~ III IIIIIIIIIIIIIIII ~~ <br />p~ pq~ <br />. - tleven~r-_-r 2, : 1981= ~~~`~~ ~! ~i.J <br />Mark S. Loye <br />Department of Natural Resources <br />Denver, CO 8G203 <br />Re: Adequacy Review <br />File No. 81-154 <br />Dear Mr. Loye: <br />~~~ ;'~ 4 ]981 ~~ ~ 'ate <br />f~'~"~~0 LAND RECLANfATPON <br />Cola. Dept. of Natural Resources <br />I will try to clarify your questions an an item 6y item basis <br />as listed in your inquiry. <br />Under application item #15, for Pit No. 1, when the;eree has keen <br />mined out, there will be a flat and level area protected an two <br />sides by a berm or elevated land. The level area will consist of <br />about five acres and will he utilized by installation of the San <br />Miguel County Maintenance Shop and storage area. <br />In Pit No. 6, this is a sandstone shelf,..ar:ledge with no topsoil <br />at all and the material is drilled and blasted to obtain large <br />stone Por rip-rap and erosion control. It is only used periodically <br />and I anticipate a life span of 10 tc 15 years before being ex- <br />hausted, but if it is discontinued before that time, then it will <br />6e housed over and used as storage area, as it is sd~acent to <br />another county maintenance shop. In this area, the county owned <br />land is twenty (20) acres, but the actual pit excavation comprises <br />an area oP about 50 feet by 200 feet. <br />Exhibit 8 <br />1. In all pit areas where there is topsoil to be removed, it is <br />~i<~^iymerely pushed to either side of excavation and stockpiled so as <br />~' t~~' to he readily available far recovery into reclamation area. We <br />y~ Q~4~ are in constant contact with the Soil Conservation Service regarding <br />stabilization of stockpiles and reclamation cover crops. In fact, <br />their office is in the same building as ours. -. <br />2. There will be some permanent fixtures and equipment graced <br />on pits No. 1 8 6 as stated in the first two paragraphs; but it <br />is unknown at this time dust what the specific placements will 6e. <br />There will be no permanent placements in any of the other sites. <br />3. 8 4. Pit #3 will enlarge the existing reservoir and when min- <br />ing is completed the surrounding area will be reclaimed back to <br />the projected water line. This is strictly a private stock pond. <br />Pit #5 is awned by the State Fish and Game Department, It is a <br />shale deposit and will be mined at no greater depth than three <br />(3) feet and will be used es a picnic and camping area. Reclaim- <br />ation will be performed to their specifications and water drain- <br />age will be diverted to where they specify. <br />