My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54672
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:42 PM
Creation date
11/20/2007 4:16:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996008
IBM Index Class Name
Permit File
Doc Date
4/2/2001
Doc Name
MEMO TO FILE
From
DMG
To
FILE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii ~~iiiiiiiiiu iii <br />MEMO TO FILE <br />PERMIT M-1996-008 <br />NORTH R-3A PIT <br />WESTERN GRAVEL, INC. <br />3/2912001 <br />RECE~~ED <br />APR o~z 2oot <br />Oirision of <br />Minera~s.,.,a ue,,, <br />tea: <br />• <br />5 19,/ r. <br />i ~;',.`.: M~1-1996 - 008 <br />.~ w.~.. <br />~~~~ , <br />The bond amount for this permit is $16,393, and is the amount that was calculated in 1996 for reclaiming <br />disturbances at the end of all mining, Phases 1 and 2 combined. It mainly covers bank shaping and mist grading, <br />topsoil replacement, and revegetation activities. Abridge vas built across the Uncompahgre River to access the <br />site from the operator's main processing facility. The bridge is inside [he permit boundary, but will remain after <br />reclamation. <br />Current disturbances are fairly well represented in the annual reports, and an assessment was made during the <br />8/8/00 inspection. <br />At this time the bond amount appears to be adequate, based on the estimate of costs which were calculated on <br />3/29/01. Current figures are based as follows: it is known that only a portion of Phase 1 is disturbed, by stripping, <br />mining, and topsoil stockpiling; some of the banks are shaped to their final gradient, some are slightly steep, some <br />are vertical; slopes below water line are considered adequate; all topsoil is stockpiled along the western pond <br />margin, and will be hauled by scraper and smoothed by dozer; along with standard revegeta[ion costs, some weed <br />control is considered needed, specifically the bindweed covering the stripped areas and a small patch of thistle. <br />Tliis bond estimate is based on current disturbance only, and should be reassessed in a few years after the operation <br />grows. Current reclamation costs are $15,003. <br />Bob Oswald, DMG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.