My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21759
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:02 PM
Creation date
11/20/2007 2:30:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
4/11/2006
Doc Name
Summary of monitoring and site activities
From
Battle Mountain Resources Inc.
To
DMG
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />April 06, 2006 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project ,/ <br />CMLRB Permit No. M-88-1 l2 <br />March 2006 Monthly Report ~ <br />Dear Mr. Sorensen: <br />RECEIVED <br />APR f- ~~~ <br />/~ YlYisigq of Minerals and Seola®y <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of Mazch 2006. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Yacuum on the [ailing lysimeters was verified on March 31~', no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on March 29`"`. March <br />tailing impoundment piezometer measurements identified these installations were either dry or <br />contained less than ] 2 inches of water as illustrated in Table 2. Tables 1 and 2 below identify the <br />depth to water measurements collected for each of the site monitoring wells, piezometers and <br />lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on March <br />29'". The March tailings pond underdrain flow average was 48.66 gpm and a total of 700 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 24.13 gpad. <br />During March, the West Pit water treatment plant operated efficiently discharging a tots[ of <br />7,647,800 gallons (23.47 acre-feet) of water to Rito Seco Creek and a total of 949,700 gallons <br />(2.91 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 • Sao Luis, Colorado 8 1 1 52-03 1 0 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.