Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2006 Monthly Report <br />Page 2 <br />Table 1-March 2006 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 3/29/06 44.34 <br />M-6 3/29/06 D <br />M-7 3/29/06 D <br />M-8 3/29/06 <br />M-9 3/29/06 141.64 <br />M-10 3129/06 25.91 <br />M-11 R 3/29/06 44.65 <br />M-12 3/29/06 178.45 <br />M-13R 3/29106 129.33 <br />M-14 3/29/06 135.37 <br />M-15 3/29/06 82.51 <br />M-16 3/29/06 23.75 <br />M-19 3/29/06 25.12 <br />M-21 3/29/06 19.33 <br />M-22 3/29/06 17.68 <br />M-26 3/29/06 17.14 <br />M-32 3/29/06 43.37 <br />M-33 3/29/06 49.94 <br />M-34 3/29/06 23.75 <br />BF-4 3/29/06 24.89 <br />BF-6 3/29/06 30.80 <br />LS-1 3/31/06 D <br />LS-2 3/31/06 <br />LS-3 3/31/06 D <br />LD-I 3/31/06 D <br />LD-2 3/31/06 D <br />LD-3 3/31/06 Dry <br />Table 2 -March 2006 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 3/29/06 D 72.46 0.00 <br />P7 3/29/06 D 92.50 0.00 <br />P8 3/29/06 96.76 97.51 0.75 <br />P9 3/29/06 71.79 72.30 0.51 <br />P10 3/29/06 57.38 58.30 0.92 <br />Pll 3!29/06 41.33 41.80 0.47 <br />