Laserfiche WebLink
i~` S. <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2006 Monthly Report <br />Page 3 <br />Table 2 - March 2006 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 3/29/06 41.67 41.71 0.04 <br />P13 3/29/06 40.92 41.34 0.42 <br />P14 3/29/06 4].24 0.00 <br />P15 3/29/06 D 41.10 0.00 <br />Table 3 below provides the calendar year 2006 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Managemeut <br />February 2006 292.5 tons Sludge transfen•ed to tailings impoundment <br />from d in ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bitl Lyle (303) 324-2630 or (970) 325-44$2. <br />i cgrely, <br />lio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File <br />