Laserfiche WebLink
~ 4..r <br />III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources ~pF'~0~ <br /> 9 <br />R <br />Ne . <br />1713 Sherman RL. Room 215 is ~~~~ <br />. <br />Denver, CO 80203 . <br />'r.,,as <br />Phone:l303)866-356: '_~eac• <br />FAX: 13031 B32-R106 <br /> Rav Romer <br /> f overnor <br />April 28, 1993 micnnelR lone <br /> D rvisron Dnec for <br />Attn: Peter Matthies <br />0029 Glen Eagle Circle <br />New Castle, CO 81647 <br />Re: Reiteration of issues pending resolution <br />Dear Mr. Matthies: <br />HS per our telephone conversai,ior, i.0uny, i aiii mutt iirij all a`ac <br />155lleS t0 paper sU i.U s~,eak ~o we can iiavc u ruYci •. rr:.il Gf t:.:, <br />1SSlieS and their resolution. for yUL1T' UUi1VCiii eiiuc. <br />+-- I--•• a .., ti. ..a„•.. ta..L n.•:c i t cvi ct7 Tf cn i t <br />as. v~u 1. ..~..la„lc.. on e w,. _~~ -- - - -. -• -- <br />needs to be wrapped and secured or removea. <br />Item 2: Sediment impedeing flow in 36" CMP at loadout. Pleases <br />clean out. <br />Ztem S. Pleli DW-. reeds .o be chec'::d an? mcr.-tc=ed _,, a regul~. <br />quart<rly basis as 3cas CS: ~3h per t`c CSM ~rspcctic^ and ceres=^ <br />last summer. Since you may nave forgotten this fine point (as I <br />have), I have includeZ *_he letter fro>^. this ^~st ?^.spection (see <br />enclosed). I also need documents illustrating that these two wells <br />have been historically mcnitored. <br />Item 4: Regarding the P.E. certification requirement, please see <br />Rule x.05.6(13) which requires all sediment ponds to be quarterly <br />monitored and inspected by a registered P.E. I have enclosed a <br />copy of the regulation for your review. <br />* Another inspection of the sediment pone F, by a registered ?.~. <br />needs to take place within this quarter, or by June 1993. The <br />most recent inspection, 4j93 is considered inadequate by the <br />Division and must be redone. <br />Ztem 5: Since topsoil pile No.2 is below the sediment pond, a <br />berm is required to be constructed around the pile. This berm is <br />to meet the 10 year-24 hour event and be designed for such. I have <br />