My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44624
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:05 PM
Creation date
11/20/2007 11:59:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Permit File
Doc Date
3/2/2000
Doc Name
COOLEY RESERVOIR FULTON WILDLIFE AREA PIT PN M-99-034
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, <br />~' ADCO CONSULTING <br /> <br />February 28, 2000 . <br />,z ~~~un <br />Mr. Tom Schreiner, Reclamation Specialist ~~~~~ ~ y,teolo9Y <br />Division of Minerals and Geology .,cnclttonetals <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re Cooley Reservoir/Fulton Wildlife Area Pit <br />DMG Permit M-99-034 <br />CHEROKEE INVESTMENTS. INC. <br />2090 EAST 104TH AVENUE SUTE 305 <br />THOfdJTON, COLCWADO 80233 <br />13031 45P2204 <br />In regard the above permit, please find accompanying this letter, a copy of the Substitute Water <br />Supply Plan and Gravel Well Permit. <br />You previously have been provided copies of the Weed Control Plan, the agreements with the Fulton <br />Ditch Company and PSCo, SPCC Plan, the Storm Water Management Plan, and the Floodplain Use <br />Permit. I also have previously provided the permit numbers of the Fugitive Dust Permit, all the Air <br />Emission Permits for the Plant's machinery, and the Stormwater and Process Water Discharge Permit. <br />The items still to be completed and the status to complete each item are as follows: <br />Technical Revision on slurry wall installation prior to slurry wall installation being <br />undertaken. Should be processed sometime later this year by CAMAS after slurry wall <br />contractor is selected. <br />Groundwater Monitoring Plan prior to groundwater being exposed and slurry wall <br />being installed. Being prepared by Tuttle Applegate. Will be implemented prior to <br />slurry wall being installed. <br />3. 404 Permit prior to excavation and backfilling of anyjurisdictional wetlands. Being <br />issued. A copy will be sent as soon as it is received. ~T~.~u ~j?~e.~ao~ ~~~ <br />Let me know if you need anything else at this time, and feel free to call if you Ftdve any questiol(s o~ <br />what has been previously submitted, or is submitted in or with this letter <br />Sincerely, a,~r1~~-r.'~'~J~+~ ~~ ~~~fl'~ <br />~N. Flees <br />cc: CAMAS, c/o Mike Refer <br />~n ~.~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.