Laserfiche WebLink
Doc Date:12111/2001 III III I II III IIII III <br />9ss <br />G2G IfY~7tar~v~ A-~~I.~C~: 1:c'~tfl~ <br />No•rember "7 , I Sri,, <br />bulaz & .associates <br />2U3 Sunset C1rCle <br />Palisade, i'O 81526 <br />Re: Geological & Geo[echnic~al Review <br />Coal `fine waste bank, S.urbo rn Creek Mina, Sc,wr r~rt i u <br />Gentlemen: <br /> Edward M. Morris, P.E., •t Liniolu <br />Det~ore Inc., has reviewed the Final Report of th~• roil Mi ne Kast,~ <br />bank D esign f or the Sanborn Greek Dliue, lrrepare•I L} i.ESfEi', <br />Report s l~lal, dated October 1996. The purpose of this Lin~~~lr, <br />Det'ore project is t.o review the geologic: and ~eote~ hrrical aSl~c•ct.S <br />of the site in response to some questions and concrrns c: .~l.ress~•rl <br />by "Ir. Thomas Anderson, P.E., of Oxbow !'Arbon d 5linera ls, Ir,• . <br />In addition, tl~e proposed road cuts and fills has bern anal}ze,i <br />for alternate construction methods, which will be prrsrnt.ed in e~ <br />separate report. Following are our findings and c•onclusic,us. <br />~;E~ERAL <br />Personnel of Linr.oln Det'ore meet wtth <br />"tr. Balaz and 9fr. Anderson on 8-28-96 and attended a meot.in_ <br />which included Mr. Gordon Erld}, of WESTEC, Mr. Charles ~'hesnik of <br /> <br />1 <br />