Laserfiche WebLink
<br />~lorado Division of Minerals and Geology • III III III IIIIIII III <br />................................. <br />sss <br />65TINATINC F08N - BULLDOZER YOBB <br />................................ <br />Task !: 1 Prep. by: JD Task File Naae: N005-1 <br />............ ......... ............. <br />Date: 03!10/94 Peroht !:N-94-005 Nine: Colosa Pit <br />............ ......... ................................. <br />Pervit Action: Final Beclaaaticn <br />............................................................. <br />Task Description: Crade Nighwalls frog 2:1 to 3:1 <br />............................................................. <br />flOUHLY EQUIPMENT C09T <br />"" "" """"""' Basic Machine: Cet DTB Norsepoxer: 21S <br /> Blade Type: Universal "" " "" <br /> Attach~ent 41: ROP9 Cab Shift Basis: 1/deq <br /> Attachaent !2: N/A " """ " <br />Cost Breakdown: <br />"" " "" " " Utilisation % (code hke( <br />Ownership cost/hr = 531.10 NIA <br />Operating 1 overhaul cost/h r- doeer = !28.18 I00 <br /> -ripper = 10.00 N/A <br />Operator cost/hr !21.58 N/A <br />Total egpt. unit coat/hr = !80.85 <br />.......... Total fleet coatlhr: !80.85 <br />.......... <br />NATE@IAL QUANTITIHS <br />Initial Swell Loose <br />Yoluae: 72,500.0 BCY Factor: 1,250 Yoluse: 90,625.0 LCY <br />............ .......... ............. <br />Source of quantity take-of[: Calculation <br />.................................................... <br />Source of est. swell factor: Prograa <br />.................................................... <br />NOURL9 PRODUCTION <br />""" " "" " "' Jab Condition Correction Factors <br />Avg, push distance: 110 ft. """""""""""" """" <br /> """ " ' Operator........•. 0.75 (avg.( <br />Unadjusted hourly Nat. consistency.. 0.90 (Cat tb1J <br />doeer production: 692 LCY/hr Dosing Method..... 1.20 (slot( <br /> "" "" ' Visibility........ 1•DO (avg.) <br />Material consistency: Jab efficiency.... : 0.63 (!sh/day! <br />Cospacted fill or eabankaent Transeiseion type. 1.00 ( PS ~ <br />"" " "" """ " " " """ " """' Crade adjustaent.. 1.60 (Cat tbll <br />Avg. push gradient: 25.00 % (nag( Altitude adj. .... 1.00 (Cat thl( <br /> "" "" ' Neterial weight.., 1.00 (Cat tbl( <br />Avg. site altitude: 6220 <br />........ ft. <br />. Blade type........ <br />........................ I.00 <br />........ (9 or U( <br />Material weight 2300.00 lb/LCY Net Job Correction 1.08 <br />Nat. Descr,: ........ . .... ......... <br />CENEEAL FILL <br />.................... <br />........ <br />......... Adjusted Uoit Prod.: <br />.... T44.86 <br />......... LCY/hr <br /> Adjusted Fleet Production: 744.66 LCY/hr <br />JOB C09T "" """"' <br />Fleet sire 1 <br />........ Doeer(sl <br />. Total Job Tiae: <br />.... 121.6T <br />........ Hours <br />. <br />Unit Coat !0,109 <br />........ /LCY <br />. Total Job Cost: <br />.... l9,83T <br />........ <br />. <br />