Laserfiche WebLink
<br />S~~ <br />• 4.23 AUGER MINING <br />Doc Date:12111/2001 <br />Revised, January 24, 1996 <br />Colowyo has identified a number of areas suitable for auger mining within <br />the active mining pits. In 1993, Colowyo initiated the first test of <br />augering in "Auger Mining Area #1" as delineated on Map 23, Mine Plan. <br />The project was a judged a success in terms of efficient and safe <br />maximization of the coal resource. In 1996, an area located in the West <br />Pit "Auger Area #2" is selected as the next auger mining project. Section <br />2.05.3 provides a description of the operation plan for both augering <br />areas. <br />The mining operation as described in Section 2.05.3 will be implemented not <br />only to maximize coal recovery but also to protect the safety of the <br />workers and to protect the environment. This section describes the methods <br />of which Colowyo will meet the requirements of Rule 4.23 Auger Mining. <br />Auger Mining Area #1 <br />As described in Section 2.05.3, the auger mining of the C coal and E coal <br />will occur under the previously mined X coal in the Section 11 pit. As <br />such, since no underground coal mining activities will take place in this <br />immediate vicinity and all recoverable coal reserves will be depleted, no <br />• consideration is necessary for future underground mining activities. <br />No auger mining will take place within 500 feet of any abandoned or active <br />underground mining operation. The augering will follow the surface mining <br />operation contemporaneously as described in Section 2.05.3. <br />Ground water in the pit or auger holes will not be a problem as the Colowyo <br />pit is essentially dry. The main pit moves updip (approximately 6%) and <br />any theoretical ground water in the pit poses little problem as the <br />backfilled spoils will allow all subsurface water to flow north downdip to <br />the original pit boxcut area. <br />Backfilling of the auger mining area will occur concurrent with the normal <br />backfilling of the main mining pit and Section 11. The entire area will <br />eventually be covered by 200-280 feet of backfill replaced and reclaimed <br />per the approved reclamation plan. <br />Auger Mining Area # 2 <br />As described in Section 2.05.3 the auger mining of X coal in the West Pit <br />will take place on the north and east end walls of the initial boxcut. <br />Since no underground activities will take place in this immediate vicinity <br />and all recoverable coal reserves will be depleted, no consideration is <br />• 3-1 <br />~~ <br />