Laserfiche WebLink
• necessary for future underground activities. <br />Revised January 24, 1996 <br />No auger mining will take place within 500 feet of any abandoned or active <br />underground mining activity. The augering will follow the surface mining <br />operation contemporaneously as described in Section 2.05.3. <br />Ground water in the pit or auger holes will not be a problem as the Colowyo <br />Pit is essentially dry and the augering will be approximately 250 - 300 <br />feet above the floor of the final multiple seam pit (F seam). Backfilling <br />of the auger mining area will occur concurrent with the normal Backfilling <br />of the West Pit. The entire area will be covered by backfilled spoil and <br />reclaimed per the approved reclamation plan. <br />There are also no buildings, powerlines or other facilities that could be <br />affected by any unexpected subsidence. <br />• <br />• <br />4 23- <br />I I\' ~~ <br />