Laserfiche WebLink
' ~.` co~~ <br />iC ^ <br />IN( ~ r <br />• ~-~ <br />Ric na~tl D Lamm <br />Govr~no~ <br />• • iiiiiiiiiiiiiiiihi <br />DEPARTr\IENT OF NATURAL RF_ ~OURCES 999 <br />MINED LAND RECL''rMATION DIVISION ~ <br />DAVID C. SHEL70N Director <br /> <br />DATE <br />April 25, 1983 <br />T0:' File C-056-82 <br />FROht: Sandra Emrich , <br />~~ <br />RE: Foidel Creek Permit Revision Application Draft Findings Meeting <br />on Friday, April 15, 1983 <br />A draft copy of the findings of compliance was niven to the applicant on <br />April 14, 1983. <br />On April 15, 1983 the Division met vrith representatives of Getty Oil Company: <br />George Young, Lar°ry Damrau, Jeff Saunders and Mike Ludlow to discuss any <br />concerns or comments they had. These ar•e briefly described belovl. <br />1. Colorado Yanlpa Coal Company's name was changed to Colorado Yampa <br />Leasing Company. The operator of the Foidel Creek P4ine will be <br />Twentymile Coal Company. George Young proposed a paragraph explaining <br />this which will be inserted into the findings. CYCC was changed to <br />"the applicant" throughout the document. <br />2. Lennox seam has not been mined at the Energy P1ines 1, 2 or 3. <br />3. Remove comments on coal quality. <br />4. Minor changes in hydrologic section to clarify statement. <br />5. On page 26 Jeff Saunders was concerned about reference to "depletion <br />of flow to Fish Creek". The Division discussed this with them and <br />we decided it would be appropriate to say decrease instead. <br />6. 30 days is too short a time to install wells on Fish Creek. Changed <br />to 120 days for installation and 30 days to present a plan.. <br />7. Time frame for• removal of v~ash-bad v1e11 too short. Division extended <br />removal time to 45 days, after Division approval. 30 days after <br />permit issuance a plan must be submitted. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-35E7 <br />