My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10843
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:22 PM
Creation date
11/19/2007 2:13:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Application Correspondence
Doc Date
10/25/1982
Doc Name
PROGRESSION OF PERMIT REVIEW
From
MLR
To
FN C-024-81 COLO COAL MINE 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO qIC HnRD D. L/MM. Gnvemm <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Enecutive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (30;3) 666-3567 <br />October 25, 1982 <br />David C. Shelton <br />Director <br />TO: File No. C-024-81; Colorado Coal Mine No. 1 <br />FROM: Susan Mowry ~~~~ <br />RE: Progression of Permit Review <br />Feb. 9, 1981 - permit document found to be complete. <br />April 21, 1981 - preliminary adequacy review letter sent out. <br />May 2I, 1981 - additional adequacy concerns regarding AVF's sent to CCMC. <br />June 17, 1981 - letter from Rade Orell confirming meeting date of June 30, <br /> 1981 - requests decision deadline extension. <br />June 23, 1981 - decision deadline extended to Aug. 18, 1981. <br />July 1, 1981 - meeting held one day late, discussed PAR. <br />Aug. 19, 1981 - Division does not make decision, letter to CCMC. <br />Nov. 10, 1981 - PAR responses submitted in part by CCMC. <br />Dec. 8, 1981 - additional PAR responses submitted. <br />Feb. 2, 1982 - draft findings sent to CCMC. <br />June 15, 1982 - meeting to discuss draft findings, draft bonding calculations <br />given to CCMC, Division requested additional info. to <br />complete bond calculations, CCMC instructed to sample surface <br />water during the summer while personnel are on site for test <br />burn excavation. <br />July 7, 1982 - meeting to discuss vegetation sampling. <br />July 16, 1982 - CCMC submitted draft findings response in part. <br />July 27, 1982 - letter to CCMC from Susan Mowry relieving them from requirement <br />to sample Pinyon-Juniper community based on its being determined <br />to be a minor community in disturbed area. Since baseline <br />surface water info. was not imrrediately available, CCMC was <br />told to provide a characterization of the surface and ground <br />water systems so findings could be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.