Laserfiche WebLink
~~~ ]^ <br />c/ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the Mined Land <br />Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested corrective actions and/or <br />3) Possible violations to be considered for possible enforcement action by the Mined Land Reclamation Board. OPERATORS <br />SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE CORRECTNE ACTION AND/OR <br />RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION OF POSSIBLE ENFORCEMENT ACTION <br />BY THE MINED LAND RECLAMATION BOARD. <br />MINE NAME: Cedarwood Clay Mine OPERATOR: Sutnmit Brick and Tile Co <br />COUNTY: Pueblo <br />MINERAL: Clay <br />INSPECTOR(S): Chris Rowe <br />TYPE OF OPERATION: Surface 110c <br />MINE ID # OR PROSPECTING ID: ~I-1997-317 <br />INSPECTION DATE: /27/2006 <br />INSPECTOR'S EQITIALS: <br />INSPECTION TYPE CODEttI: <br />JOINT INSP. AGENCY CODEtzI: <br />WEATHER CODEI4I: <br />CMR DATE OF COMPLAINT: <br />MI POST INSP. CONTACTStz>. <br />Ph: 303-866-4922 email: chris.rowe@state.co.us <br />SIGNATURE/DATE: <br />TIME OF DAY (MILITARY): 0900 <br />REASON FOR INSP. CODEtaI: IE <br />CL BOND CALCULATIONTYPEtsI: BC <br />OPERTOR. REPRESENTATIVE. PRESENT: Matt Welte <br />L INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, Mt=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-opemfion] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL=BLM, CH-Colo. Dept. Health; CL=land Board, <br />CT~itizen; CW=Wildlife, FS=Forest Service, HW=Hvry. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CL-RS: AG~ther Agency Request, CT~itizen Complaint, IE=Normal I&E Program, HP=High Priority, PY=Priority] <br />4. WEATHER CODE - [CL-WE: CL~Ioudy, CR~tear, IN=Inclement -prevented inspection, RN=Raining, SN=Snowing, WD=Windy] <br />5. BOND CALCULATION TYPE: - [BC~omplete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and petmit pazameters inspected and gives a categorical evaluation of each. IF A <br />PROBLEM (PBI OR POSSIBLE (PVI VIOLATION IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES <br />CAREFULLY IN ORDER TO ASSURE COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE <br />RULES AND REGULATIONS. If a Possible Violation (PV) is indicated, you will be notified under separate cover when the <br />Mined Land reclamation Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... <br />Y (FN) FINANCIAL WARRANTY...... <br />Y (RD) ROADS ................... Y <br />(HB) HYDROLOGIC BALANCE ............... Y (BG) BACKFILL & GRADING....... Y (EX) EXPLOSIVES........... NA <br />(PW) PROCESSING WASTE/TAILING...... NA (SF) PROCESSING FACILITIES..... NA (TS) TOPSOIL ................. Y <br />(MP) GENERAL MINE PLAN COMPLIANCE .. Y (FW) FISH & WILDLIFE ............... Y (RV) RE VEGETATION..... Y <br />ISM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... Y (SB) COMPLETE INSPECTION.. Y <br />(ES) OVERBURDEN/DEVELOPMENT Y <br />(SC) EROSION/SEDIMENTATION.. <br />Y (RS) RECLAMATION <br />Y <br />WASTE .............................................. PLAN/COMPLIANCE........... <br />(AT) ACID OR TOXIC MATERIALS......... NA (OD) OFF-SITE DAMAGE .............. Y (ST) STIPULATIONS........ NA <br />Y =Inspected and Found in Compliance PV =Inspected and Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicabl e <br />