Laserfiche WebLink
~o ~, I~ <br />~~s~~.~-~U., <br />°P ~a~~c~ <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 10/30/2002 <br />User : KAP <br />County :Grand <br />Site :Thompson Resources <br />Permit/job# : M-1983-102 <br />Abbreviation :none <br />Filename : M102-001 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :bond recalculation -inspection <br />Task description :grade highwall <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> tJtIIlZatlOn <br />Cost Breakdown : Ownership cosUhour : $42.44 NA <br />Operatingcost/hour : $59.07 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $30.65 NA <br />Total unit cost/hour : $132.17 Total fleet cost/hour : $132.17 <br /> <br />MATERIAL QUANTITIES ~~ ~ ~ ~~ <br />Initial Swell Loose <br />volume : 19,200 LCY factor : NA volume : 19,200 LCY <br />Source of estimated volume :reclamation map <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,627.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />20.00 % (/ <br />8.015 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.54 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.24 <br />Adjusted unit production <br />Adjusted fleet production <br />(Cat H(3) <br />HB) <br />397.99 LCY/hr <br />397.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 48.24 Hours <br />Unit cost : $0.332 /LCY Total job cost : $6,376 <br />State :Colorado <br />