My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC16601
DRMS
>
Back File Migration
>
Inspection
>
INSPEC16601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:17:56 PM
Creation date
11/18/2007 9:16:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
Inspection
Doc Date
10/30/2002
Doc Name
Cost Summary Form
Inspection Date
9/27/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 10/30/2002 <br />User : KAP <br />State :Colorado <br />Pennit/job# : M-1983-102 <br />County :Grand Abbreviation :none <br />Site :Thompson Resourcesw Filename : M102-003 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :bond recalculation -inspection <br />Task description :glade tOpS01/ <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat OSR - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $42.44 NA <br />OperatingcosUhour : $59.07 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost/hour : $30.65 NA <br />Total unit cost/hour : $132.17 Total fleet cosUhour : $132.17 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 23,393 LCY factor : NA volume : 23,393 LCY <br /> <br />Source of estimated volume :reclamation plan <br />Source of estimated swell factor :NA <br />HOURLY~PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 1,627.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />3.00 % (neg) <br />8, 015 feet <br />2, 550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.169 /LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUdal <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.07 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HBJ <br />Blade type : 1.00 (S/SU/U <br />Net correction : 0.48 <br />Adjusted unit production : 781.38 LCY/hr <br />Adjusted fleet production : 781.38 LCY/hr <br />Total job time : 29.94 Hours <br />Total job cost : $3,957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.