Laserfiche WebLink
'[~~~ ~ Bridal Veil Construction, LLC <br />PO Box 1821 <br />A~CBiV~ <br />Ouray, CO 81427 ~~1*' ~~~ Z~ <br />970-325-4684 (Office), 970-729-1823 (Cell) <br />Mining Permit M-2001-054 ~s~ anM a ais 8 Leo <br />°9Y <br />July 29, 2003 <br />Box Oswald ~ ; (~~~ LV` <br />Colorado Division of Minerals and Geology 1~ V <br />Durango Field Office <br />701 Camino del Rio, Room 125 <br />Durango, CO 81301 <br />N~~2.o01-v~¢- , <br />Deaz Bob, C~ 1'-'1 ~~~--/(/ 3 ~~~ <br />Lynn has finished phase 2 of our mining permit corrections, the drainage channel and catchment <br />basin on July 28, 2003 as per engineer specs. We have had approval from the engineers, Brian <br />Briggs and Chad Glover. I am enclosing copies of the spec's for your review. <br />The channel has been rip-rapped with lazge rocks, as has the catchment basin where the water <br />will flow in and out. We did not rip-rap the other two sides of the catchment basin, because we <br />will be cleaning it out and maintaining it as it fills up. <br />The future roadway has been graded, and reseeded. The engineer has sent in the drawings to <br />Melinda Ice of CDOT, but has not heard from her as to whether they aze going to approve the <br />other driveway. In the past, they said we had to move it, but we are working with new personnel <br />now. <br />We got pictures developed yesterday, and are enclosing them for your records. Come on up <br />anytime to see it! We will now begin working on bench one (1) again. <br />Thanks for all of your help. We appreciate you guys! <br />Sincerely, <br />Connie Wurst for Lynn Olin <br />Bridal Veil Construction <br />CC Forsgren and Associates <br />Enclosures: Pictures <br />RE~~~.~ <br />AUGOg~ <br />Disision o1 Minerals ant CeoloBr <br />Engineer Drawings <br />Letter of Approval from Engineer <br />