Laserfiche WebLink
__ FORSGREN <br />__ ASSOCIATES /INC. <br />= ACOMPANY OF ENGINEERS AND SCIENTISTS <br />July 29, 2003 <br />Mr. Bob Oswald <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Minerals and Geology <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />RE: Bridal Veil Construction, M-2001-054 <br />Dear Bob, <br />J(/~ <br />A~c~~~E'd <br />". <br />his ~o ~9o'9e <br />Mi~eja/o~~~~e <br />$ ~'e% <br />Regarding the schedule of mining that Bridal Veil Construction is to follow, they have completed <br />the channel runoff that was to have been completed in the first year of permit approval. I have <br />inspected the channel construction, along with the sediment pond and riprapped overflow as <br />asked by the client, and both were constructed as planned and finished within the allowed time <br />frame of your offece. Bridal Veil Construction is now moving forward with the plan of <br />excavating bench # 1. <br />Should you have any questions or comments about the currently completed corrective actions <br />taken at the Bridal Veil Pit, please feel free to contact me at (970) 325-4320. <br />Sincerely, <br />Chad E. Glover <br />Civil Engineer <br />A COMPANY OF ENGINEERS AND SCIENTISTS PO BOX 738 /OURAY, CO 81427/ (970) 325-4320 /FAX (970) 325-0624 <br />REXRURG /BOISE/WYOMING /WENATCHEE/SALT LAKE CITY/SACRAMENTO/COLORADO <br />wwwiorsgren.com <br />