Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Site Wide Reclamation Cost Estimate MT-3 <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/6/2024 County: Montrose Filename: C089-000 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 004 Regrade Facilities Area(Post SL-4 40% DOZER 2 3.90 $6,711 <br /> Remaining) <br /> 010 Rip Facilities Area(Post SL-4 40%Remaining) RIPPER 2 2.30 $4,171 <br /> 020 Regrade East Coal Gate Rd(Post SL-4 40% DOZER 2 0.28 $478 <br /> Remaining) <br /> 022 Regrade South Access Road(Post SL-4 40% DOZER 1 0.67 $574 <br /> Remaining) <br /> 031 Finish Grade Facilities Area(Post SL-4 40% GRADER 1 2.00 $496 <br /> Remaining) <br /> 040 Regrade Pond NIIN-001 (Post SL-4 40% DOZER 1 11.92 $5,688 <br /> Remaining) <br /> 041 Regrade Pond NIIN-002(Post SL-4 40% DOZER 1 16.02 $7,646 <br /> Remaining) <br /> 043 Regrade DitchNIIN-001 East(Post SL-4 40% DOZER 1 2.19 $1,046 <br /> Remaining) <br /> 044 Regrade Ditch NIIN-001 West(Post SL-4 40% DOZER 1 0.55 $262 <br /> Remaining) <br /> 059 Replace Topsoil from Stockpile to Facilities Area TRUCKI 1 4.75 $11,947 <br /> 060 Replace Topsoil from Stockpile to Topsoil DOZER 2 2.05 $3,523 <br /> Stockpile Area <br /> 066 Replace Topsoil from Stockpile to Pond NIIN-001 TRUCKI 1 5.31 $13,365 <br /> and Ditches <br /> 067 Replace Topsoil from Stockpile to Pond NIIN-002 TRUCKI 1 2.94 $8,493 <br /> and Ditches <br /> 075 Reseed DP with Dryland Mix#8 not PII released REVEGE 1 5.80 $2,385 <br /> 075II Reseed DP with Dryland Mix#8 PII released REVEGE 1 26.70 $10,979 <br /> 076 resed 88.3 acres Irrigated Pasture Mix#5 PII REVEGE 1 88.00 $41,973 <br /> approved <br /> 077 Seed areas in long term facil.Dryland mix 8(2021 REVEGE 1 42.00 $22,597 <br /> ARR) <br /> 089 Weed Spraying 5 ac/yr X 5 yr REVEGE 1 25.00 $4,006 <br /> 095 Demolish and Remove All Structures DEMOLISH 1 32.00 $25,376 <br /> 100 Plug and Seal All Monitoring Wells BOREHOLE 1 36.00 $3,797 <br /> 105 Clean Sediment Ponds(Post SL-4 40% TRUCKI 1 38.16 $26,455 <br /> Remaining) <br /> 106 Site Maintenance Over Liability Period(5 more SITEMAINT 1 100.00 $45,623 <br /> ears) ENANCE <br /> 110 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 11.77 $11,963 <br /> Reclamation <br />