Laserfiche WebLink
Cost Summary Worksheet Cont'd Task 4 000 Page 2 of 2 <br /> 111 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 8.22 $3,860 <br /> Cleaning <br /> 112 Mobilize/Demobilize Equipment for Site MOBILIZE 1 8.22 $36,714 <br /> Maintenance <br /> 113 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 8.22 $4,272 <br /> Removal <br /> SUBTOTALS: 484.97 $304,400 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $6,149 <br /> Performance bond: 1.05 Total= $3,196 <br /> Job superintendent: 242.49 Total= $19,222 <br /> Profit: 10.00 Total= $30,440 <br /> TOTAL O&P= $59,007 <br /> CONTRACT AMOUNT(direct+O&P)= $363,407 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 6.59 Total= $23,949 <br /> Reclamation management and/or administration: 4.89 $17,771 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $101,226 <br /> TOTAL BOND AMOUNT(direct+indirect)= $405,626 <br /> CIRCES Cost Estimating Software <br />