Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#004 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Facilities Area(Post SL-4 40%Remaining) <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 12/3/2024 County: Montrose Filename: C089-004 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- I IU <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $496.62 NA <br /> Operating Cost/Hour: $324.90 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $860.11 <br /> Total Fleet Cost/Hour: $1,720.21 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 7,744 <br /> Swell factor: 1.125 <br /> Loose volume: 8,712 LCY <br /> Source of estimated volume: Map 2.05.3(3)-3 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 2,870.3 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />