My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-11_BONDING - C2010089
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C2010089
>
2024-12-11_BONDING - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 7:10:25 AM
Creation date
12/12/2024 6:50:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Bonding
Doc Date
12/11/2024
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
MT3
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#004 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Facilities Area(Post SL-4 40%Remaining) <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 12/3/2024 County: Montrose Filename: C089-004 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- I IU <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $496.62 NA <br /> Operating Cost/Hour: $324.90 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $860.11 <br /> Total Fleet Cost/Hour: $1,720.21 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 7,744 <br /> Swell factor: 1.125 <br /> Loose volume: 8,712 LCY <br /> Source of estimated volume: Map 2.05.3(3)-3 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 2,870.3 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.