Laserfiche WebLink
CQLQRADQ <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> DATE: July 25, 2023 <br /> TO: Interested Contractors <br /> FROM: Craig Bissonnette, Division of Reclamation Mining and Safety <br /> RE: DQ1 PKAA 2024*0040 Ocean Wave Project <br /> This Request for Documented Quotations (DQ) is issued by the State of Colorado, acting by and <br /> through the Department of Natural Resources, Division of Reclamation, Mining and Safety <br /> (DRMS). Enclosed is a brief description and bid schedule for the Ocean Wave Project. <br /> PROJECT LOCATION <br /> The Project is located in Lake County approximately four (4) miles east of downtown Leadville <br /> in the historic mining district. Please see the attached map. <br /> WORK SUMMARY <br /> The project work will involve safeguarding three (3) hazardous shafts using various closure <br /> methods including polyurethane foam, concrete and backfill. <br /> NOTE:OSHA 40-hour HAZWOPER training (29 CFR 1910.120) is required for all personnel <br /> working on this project. Please see Special Requirements section below for additional <br /> details. <br /> MANDATORY PRE-BID MEETING <br /> The mandatory pre-bid meeting and site showing for the Ocean Wave Project will be held on- <br /> site on Wednesday, August 2, 2023 at 10:00 AM at the intersection of U.S. Highway <br /> 24/Harrison Avenue and Monroe Street in Leadville, CO (at the south end of Harrison Ave). <br /> Please see attached map. The purpose of the Pre-Bid meeting is to afford potential bidders the <br /> opportunity to inspect the proposed work and access conditions. Bidders are advised to be <br /> prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms to register their <br /> attendance. It is the bidder's responsibility to make certain their attendance is recorded on the <br /> sign-in sheet. Signing the Pre-Bid Meeting attendance list to represent more than one <br /> person or company is not permitted. Failure to sign-in and sign out, as directed by the Project <br /> Manager, will be cause for rejection of a bid. <br /> Each individual may represent themselves or a single company at the virtual pre-bid for <br /> the purpose of bidding. <br /> Rev. 07/07/2023 <br /> Page 1 of 20 <br />