Laserfiche WebLink
EXHIBIT L <br /> Reclamation Cost <br /> A phased and cumulative bonding approach is proposed for the Sunset Industrial Pit mining site <br /> operation. The financial warranty required for each phase is the warranty required to completely <br /> reclaim that phase. <br /> The financial warranty required for each phase of mining includes a cost component for the <br /> slurry wall liner required to close the current mined area should project be stopped and the <br /> operator defaulted. Because the slurry wall liner required to close the current mined area for <br /> each phase of mining is replaced with a new slurry wall liner required to close the current mined <br /> area component as the next phase of mining occurs, the financial warranty required for this <br /> component for the previous phase is credited back in each phase's required financial warranty <br /> calculation. This accurately calculates the additional financial warranty required for any given <br /> phase of mining and for the current limit of disturbance as well as accounting for the financial <br /> warranty that has already been posted to ensure that the Division has sufficient cumulative <br /> financial warranty to complete the reclamation. <br /> Direct costs related to the construction of the reclamation components that have been included <br /> in the financial warranty calculations include: Scarifying disturbed ground surfaces, re-applying <br /> topsoil over disturbed areas, revegetating disturbed areas, dewatering the full pit, slurry wall <br /> liner construction, and contractor mobilization. The slurry wall liner construction costs have been <br /> broken down further to include costs for different depths to bedrock as provided from the DRMS <br /> on previous 112 applications. <br /> Overhead, profit, and project management costs were then calculated and added to the direct <br /> construction costs to arrive at the required financial warranty for each phase. <br /> As each new phase is started, the financial warranty for that phase will be posted with the <br /> Division. When a phase has been reclaimed, inspected, and accepted by the Division, the <br /> associated financial warranty for that phase can then be reduced/released to 20% of the <br /> financial warranty required for that phase. <br /> Please see the attached calculations for details of the costs and quantities used to determine <br /> the financial warranty required for each phase of mining. <br /> The following table summarizes the financial warranty required for each phase, and the <br /> cumulative financial warranty that will be provided during any given phase. <br /> Reclamation Cost Summary <br /> Additional <br /> Financial Cumulative <br /> Warranty Financial <br /> Phase Re uired Warranty <br /> 1a $252,379 $252,379 <br /> 1 $2,274,913 $2,527,292 <br /> 2a $80,391 $2,607,6832 <br /> 2 $903,776 $3,511,459 <br /> J-2 Contracting Company <br /> JaT Consulting,Inc. Sunset Industrial Pit <br /> DRMS 112 Permit Application <br />