Laserfiche WebLink
of C0 <br /> " COLOF TR02 KING AND SAFETY <br /> 1876* I 3)866-3567 <br /> PSH/jle itD <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> AUG 0 72020 <br /> File No.: M- 2001 -022 Site Name: Green Croissant <br /> WTION <br /> Weld A,NUK-1&S ETY <br /> County TR# (DRMS Use on ) <br /> Permittee: Loveland Ready-Mix Concrete, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Stephanie Fancher English <br /> Please provide a brief description of the proposed revision: <br /> Asking for yearly report of survey points along gas line to be discontinued. No mining <br /> K o N <br /> full of water since February 2018. Site has been in last stages of reclamation since April 2018. o : O <br /> cu' <br /> a O <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application 0 rN <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or o <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted ccn <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the o <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to I� o I_q <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will = v X <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a o NJTR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 n <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />