My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-23_REVISION - M2014011
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014011
>
2020-06-23_REVISION - M2014011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:11:29 PM
Creation date
6/23/2020 11:15:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014011
IBM Index Class Name
REVISION
Doc Date
6/23/2020
Doc Name
Request for Technical Revision
From
Strong Mining Co.
To
DRMS
Type & Sequence
TR1
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.co� <br /> COLORADO DI T R O 1 LAMATION, MINING AND SAFETY <br /> ' <br /> * " 1313 Sherman Colorado 80203 ph(303)866-3567 <br /> *1876' ACY/thm RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET JUN 2 3 202D <br /> 2 014 011 A DWI�o O LAAM <br /> File No.: M- Site Name: ex p ,,,P ,.,pS�,FE, <br /> County Garfield TR# (DRMS Use only) <br /> Permittee:Strong mining company <br /> Operator(If Other than Permittee):John Strong <br /> Permittee Representative: George Strong <br /> 0 ic <br /> Please provide a brief description of the proposed revision: K n 1 <br /> Submit of final reclamation plan as per Forest service o <br /> CD <br /> ;v a b <br /> 0 <br /> o' <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application N <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. o <br /> D < <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the < 5 5Division (as listed below by permit type). Please submit the appropriate fee with your request to :7 o O <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will can —' <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, I I2d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.