Laserfiche WebLink
COLORADO <br /> Division of Reclamation. <br /> Mining and Safety <br /> Department of Nahaal Resources <br /> MINERALS PROGRAM INSPECTION REPORT <br /> PHONE: (303) 866-3567 <br /> The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> The Shores M-1998-013 Sand and gravel Weld <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP. TIME: <br /> Preoperation Inspection Eric Scott May 15,2020 10:00 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Bestway Concrete Company Mark Johnson 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Preoperation Inspection Complete Bond $889,177.00 <br /> DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br /> NA None None <br /> WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br /> Clear May 19,2020 <br /> The f`ollo ing inspection topics ere identified as having Proble s or Possible Violations® OPERATORS <br /> SHOULD EA THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated you ill be notified under sc Karate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Revegetation—excessive weeds <br /> PROBLEM/POSSIBLE VIOLATION: Problem: There are state-listed noxious and nuisance weeds present on site. <br /> Section 3.1.10 (6) of the rule states that weed control methods be implemented for state listed noxious weed <br /> species within the permitted area, and to reduce the spread of weeds to nearby areas. <br /> CORRECTIVE ACTIONS: Implement approved weed control plan and provide proof to the Division that this has <br /> been done. If a weed control plan is not already in place,the operator shall develop a weed control and <br /> management plan in accordance with Section 3.1.10 (6) of the Rule. This plan should be developed in <br /> consultation with the county extension agency, or weed control district office and should include specific <br /> control measures to be applied, a schedule for when control measures will be applied and a post-treatment <br /> monitoring plan. This weed control plan shall be submitted to the Division as a Technical Revision to the <br /> approved plan with the appropriate Technical Revision fee of$216.00 by the corrective action date. <br /> CORRECTIVE ACTION DUE ATE: 10/30/20 <br /> Page 1 of 4 <br />