Laserfiche WebLink
' t01rLD <br /> h. -aa Division of Reclamation, <br /> Mining and Safety <br /> Departrnertt of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver,Colorado 80203 <br /> May 1,2020 <br /> Andy Rodriguez <br /> Civil Resources <br /> PO Box 680 <br /> Frederick CO 80530 <br /> Re: Second Review of a 112 Construction Materials Reclamation Permit Amendment Application Package <br /> AM03,Bestway Concrete Company,Permit M1998-013 <br /> Mr. Rodriguez: <br /> The Division of Reclamation, Mining, and Safety has completed its second adequacy review of your 112 <br /> construction materials reclamation permit amendment application. The application was called complete for review <br /> on February 19, 2020. All comment and review periods began February 19, 2020. The decision date for this <br /> application is May 19 2020. Please be advised that if you are unable to satisfactorily address any concerns <br /> identified in this review before the decision date, it will be your responsibility to request an extension of the <br /> review period. If there are outstanding issues that have not been adequately addressed prior to the end of <br /> the review period, and no extension has been requested, the Division will deny this application. In order to <br /> allow the Division adequate time to review your responses to any adequacy issues, please submit your <br /> adequacy responses to the Division no later than one week prior to the decision date (May 12,2020). <br /> Please note that any changes or additions to the application on file in our office must also be reflected in the <br /> public review copy, which has been placed with the Weld County Clerk and Recorder. <br /> The review consisted of comparing the application content with specific requirements of Rule 6.1, 6.2, 6.4 and 6.5 <br /> of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of <br /> Construction Materials. As with most applications,there are items that will require clarification of the existing <br /> information. Any inadequacies are identified under the respective exhibit heading. <br /> EXHIBIT L -Reclamation Costs (Rule 6.4.12): All information necessary to calculate the costs of reclamation <br /> must be submitted and broken down into the various major phases of reclamation. You must provide sufficient <br /> information to calculate the cost of reclamation that would be incurred by the state. <br /> DRMS will require additional information to be included in the reclamation estimate provided. At this time, <br /> DRMS notes that the mining plan states that Cells 2A and 3 will be mined at 2:1 slopes,but no volumes or costs <br /> have been provided for backfilling from 2:1 to the required final 3:1 internal slopes; please also provide the linear <br /> feet of slurry wall, and perimeter distances requiring backfill for these excavations. <br /> Also per our previous discussion, DRMS will need additional information on the following items:backfill of the <br /> settling pond areas, (existing settling area for shores looks closer to 22 acres); additional information for <br /> backfilling of cells 1 and 2B -how much fill needed for each,where the material is coming from and what it's <br /> going to cost to move it from it's current location to where it needs to be utilized; backfill of infiltration area north <br /> of Pond E; an acreage breakdown for ripping, topsoil replacement, and revegetation around each pond and <br /> F'Cpl0 <br /> `k <br /> 1313 Sherman Street, Room 215, Denver,CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us ._`. 9�'` <br /> o <br /> Jared Polis,Governor Dan Gibbs, Executive Director Virginia Brannon, Director <br />