Laserfiche WebLink
Andy Rodriguez <br /> May 1,2020 <br /> Page 2 of 2 <br /> backfilled area; descriptions and cost for the trees shown on the rec map for the ROW in the SW corner of the <br /> permit; and the cost for replacing the lateral crossing"pond 1". We will also need more detail about when the <br /> slurry walls and spillways for 2a and 3 will be bonded as well as backfilling of 2b. Those areas will be off-limits <br /> to disturbance until the appropriate bonds are posted. <br /> EXHIBIT S -Permanent Man-Made Structures (Rule 6.4.19): Please review and update the status for the notices <br /> mailed out for all property owners within 200' of the permit, as well as structure owners within 200' of the <br /> permit. <br /> DRMS notes that a geotechnical evaluation has been provided with the amendment submittal package. <br /> Any letters from other commenting agencies/entities received by the Division for this permit to date are available <br /> for review through the imaged document data link provided below, or through the DRMS website. <br /> https://www.colorado.gov/pacific/drms/data-search <br /> This concludes the Division's preliminary adequacy review of this application. This letter shall not be construed <br /> to mean that there are no other technical deficiencies in your application. Other issues may arise as additional <br /> information is supplied. Please remember that the decision date for this amendment application is May 19, 2020. <br /> As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies prior to this <br /> date, it will be your responsibility to request an extension of time to allow for continued review of this <br /> application. If there are still unresolved issues when the decision date arrives and no extension has been <br /> requested,the application will be denied. If you have any questions,please contact me at(303) 866-3567 x8140. <br /> Sincerely, <br /> f <br /> 4 <br /> Eric Scott—Environmental Protection Specialist <br />