My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-21_REVISION - M2016084
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016084
>
2020-01-21_REVISION - M2016084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 11:59:11 AM
Creation date
1/21/2020 2:00:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016084
IBM Index Class Name
REVISION
Doc Date
1/21/2020
Doc Name
Request for Technical Revision
From
CRG Mining
To
DRMS
Type & Sequence
TR1
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DI` MATION MINING AND SAFETY <br /> 01 1876 1313 Sherman St lorado 80203 ph(303)866-3567 <br /> DMClthm <br /> REQUEST FOR ThtjifNIC;AL REVISION (TR) COVER SHEET <br /> File No.: M- 2016-084 site Name:Sacramento Access Tunnel <br /> County Gunnison TR# Use onW <br /> Permittee:CRG Mining, LLC RECEIVED <br /> Operator(If Other than Permittee):Same P JAN 21 2020 <br /> Jake Wilkinson % DMSIONOFRECLAMATION <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: <br /> Operator proposes to increase the dimensions of the planned Sacramento Tunnel,which is not yet constructed,to <br /> accommodate larger equipment. The current plan is for an 8 ft x 8 ft tunnel,and we wish to make it 12 ft x 12 ft. No other <br /> o 0 <br /> 0 <br /> 3 c <br /> o 'fl N <br /> Ey <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application o b <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or N CP <br /> 46 <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will c <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a °I,-p <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction <br /> materials, and 112 quarries $216 J <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.